PDG JH1
OperationalSedenak Tech Park (STeP), Kulai, Johor
PDG's flagship 150 MW AI-ready hyperscale campus at Sedenak Tech Park, Johor, whose 60 MW first phase was delivered in July 2024 twelve months after groundbreaking.
Operator
Princeton Digital Group
City
Kulai, Malaysia
Power, MW
150 MW
Cooling
Air
Opened
2024
AI-ready
Yes
JH1 is Princeton Digital Group's flagship AI-ready hyperscale campus at Sedenak Tech Park in Kulai, Johor, developed on land acquired from JLand Group and planned for more than 150 MW of capacity representing roughly USD 1.5 billion of investment. The first phase, comprising 52 MW, was delivered in July 2024 just twelve months after groundbreaking — an unusually fast build for a campus of this scale — with a first-phase investment of around RM 2 billion. PDG designed JH1 for the AI training and hyperscale cloud workloads driving the Johor market, and one of its buildings (DC2) carries OCP Ready for Hyperscale recognition from the Open Compute Project. Sustainability measures include rooftop solar generation, and the campus was financed in part through an RM 1.276 billion green loan. Sitting within the Sedenak cluster that has become Johor's principal hyperscale corridor, JH1 serves some of the world's largest technology companies and is the natural landing point in Malaysia for large-block AI capacity requirements.
- ▮150+ MW AI-ready hyperscale campus at Sedenak Tech Park, Johor
- ▮52 MW phase one delivered July 2024, twelve months after groundbreaking
- ▮OCP Ready for Hyperscale recognition (DC2 building)
- ▮Rooftop solar and an RM 1.276 billion green loan backing the build
- ▮Serves hyperscale cloud and AI training deployments
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Get QuotesSource: PDG JH1 Phase One delivery, PDG JH1 factsheet · data pending on-site verification