AIMS Cyberjaya Block 1
In BetriebJalan Teknokrat 1/2, Cyber 3, Cyberjaya, Selangor, Malaysia
Purpose-built AIMS data centre launched in Cyberjaya in April 2019 that reached more than 90% occupancy in under a year.
Betreiber
AIMS Data Centre
Stadt
Cyberjaya, Malaysia
Leistung, MW
—
Cooling
Air
Opened
2021
Block 1 anchors AIMS' greenfield campus on Jalan Teknokrat 1/2 in Cyberjaya, a purpose-built hyperscale-grade site whose overall power capacity is scalable to 50 MW. Construction began in Q3 2020 and the first phase entered service in Q2 2021, filling quickly: AIMS reported more than 90% occupancy in under a year. The building carries Uptime Institute Tier III certification for both design documents (April 2020) and the constructed facility (May 2021), and the campus is TVRA-compliant with 24x7 on-site auxiliary police. Connectivity is a differentiator for a Cyberjaya site: tenants get direct on-ramps to Microsoft Azure, AWS and Google Cloud, plus access to the Malaysia Internet Exchange (MyIX), which AIMS operates from its Kuala Lumpur hub. Located in the Multimedia Super Corridor about 30 minutes from KLIA, Block 1 serves enterprises and cloud-adjacent workloads that want certified concurrent maintainability outside the Kuala Lumpur city core.
- ▮Uptime Tier III certified (design 2020, constructed facility 2021)
- ▮Campus power scalable to 50 MW
- ▮Over 90% occupancy within first year of service
- ▮Direct on-ramps to Azure, AWS and Google Cloud; MyIX access
- ▮TVRA-compliant with 24x7 on-site auxiliary police
Beschreiben Sie Ihren Bedarf — wir matchen Sie mit Rechenzentren aus unserem Katalog und liefern echte Angebote. Kostenlos für Käufer.
Angebote erhaltenQuelle: AIMS Cyberjaya · data pending on-site verification