GDS at YTL Green Data Center Park

Angekündigt

YTL Green Data Center Park, Kulai, Johor, Malaysia

Partnership between YTL and GDS to co-develop 168 MW of capacity across eight data centre facilities at the YTL Green Data Center Park in Kulai, Johor.

Betreiber

GDS Holdings / YTL Power

Stadt

Kulai, Malaysia

Leistung, MW

168 MW

Cooling

Air

Announced in April 2022, this co-development pairs GDS Holdings with Malaysia's YTL Power to build 168 MW of capacity across eight separate data centre buildings inside the YTL Green Data Center Park at Kulai, Johor — roughly 30 km from both Johor Bahru and Singapore. The park itself is master-planned for 500 MW of data centre capacity matched with an equivalent amount of solar generation, with about 1,500 acres of adjacent land earmarked for solar farms, and was billed as Malaysia's first hyperscale campus powered by on-site renewable energy. For the GDS-YTL tranche, the first phase was slated to enter service in 2024 under the original agreement. The renewable-first power architecture differentiates the site from grid-dependent Johor competitors and appeals to hyperscale and AI tenants carrying net-zero commitments. Building-level specifications, certifications and floor areas for the GDS facilities have not been published, so the project should be assessed at campus level for now.

  • 168 MW planned across eight data centre facilities
  • Located in the 500 MW YTL Green Data Center Park, Kulai, Johor
  • ~1,500 acres of adjacent land allocated to solar farms powering the park
  • About 30 km from both Johor Bahru and Singapore
  • First phase originally targeted for service entry in 2024

Beschreiben Sie Ihren Bedarf — wir matchen Sie mit Rechenzentren aus unserem Katalog und liefern echte Angebote. Kostenlos für Käufer.

Angebote erhalten

Quelle: GDS investor press release · data pending on-site verification