Vantage CWL1 Cardiff Campus
In BetriebCeltic Way, Coedkernew, Newport NP10 8BE, Wales
46-acre campus near Cardiff with two of three planned data centers operational, 2,000,000 gross sq ft and rack densities from 2 kW to 125 kW+.
Betreiber
Vantage Data Centers
Stadt
Cardiff, Vereinigtes Königreich
Leistung, MW
—
Cooling
Air
Floor space
186,000 m²
Max density
125 kW/rack
Renewable energy
100%
AI-ready
Yes
A private 400kV SuperGrid connection sets the Cardiff campus apart from most UK colocation sites: Vantage's CWL1 draws grid power directly rather than through local distribution, supporting 148MW of critical IT load. The 46-acre site at Celtic Way near Newport, South Wales, spans roughly 2,000,000 gross sq ft (186,000 sqm) across three planned data centers, two of which are operational. Rack densities run from standard 2kW deployments up to 125kW and beyond, served by a mix of indirect evaporative air handling, dry cooler CRAH systems and pumped DX, with customized HPC cooling available and minimum N+1 redundancy on mechanical plant. The campus runs on 100% renewable energy and holds ISO 9001, 14001, 27001 and 45001 certifications alongside ISAE 3402 and SOC 2 attestations, built to Tier III standards. Wales-to-London latency under 1.5ms, 12+ international carriers and LINX Wales hosting make it viable for hyperscalers and AI operators seeking large contiguous capacity outside the constrained London market.
- ▮148MW critical IT load with direct private 400kV SuperGrid connection
- ▮46-acre campus, ~2,000,000 gross sq ft across three data centers (two operational)
- ▮Rack densities from 2kW to 125kW+ with customized HPC cooling options
- ▮100% renewable energy; ISO 9001/14001/27001/45001, ISAE 3402, SOC 2
- ▮Sub-1.5ms latency to London; 12+ carriers and LINX Wales on site
Beschreiben Sie Ihren Bedarf — wir matchen Sie mit Rechenzentren aus unserem Katalog und liefern echte Angebote. Kostenlos für Käufer.
Angebote erhaltenQuelle: Vantage Cardiff campus page · data pending on-site verification