299 Wan Po Road, Tseung Kwan O, New Territories, Hong Kong

Purpose-built greenfield data center in Tseung Kwan O with LEED Gold certification, part of SUNeVision's Hong Kong portfolio alongside the MEGA IDC development.

Operator

SUNeVision (iAdvantage)

Kota

Hong Kong (Tseung Kwan O), Hong Kong

Daya, MW

Cooling

Air

Opened

2017

Floor space

44,036 m²

LEED Gold

MEGA Plus was built on the first plot of land the Hong Kong SAR government specifically set aside for high-tier data center development, a one-hectare greenfield site at 299 Wan Po Road in Tseung Kwan O. Completed in 2017 by SUNeVision, the iAdvantage-operated facility delivers about 474,000 square feet (roughly 44,000 square meters) of gross data center space and draws power from an on-premise 132 kV substation, giving it capability for more than 24 MW of IT load with full system and distribution-path redundancy for concurrent maintenance. The purpose-built tower earned LEED Gold certification and sits deliberately away from hazardous industries and flood-prone waterfront, with unrestricted subleasing terms that appeal to wholesale tenants. Adjacent land offers expansion potential of approximately 1.2 million square feet, and the site works alongside SUNeVision's MEGA Campus portfolio, including the newer MEGA IDC development. Its combination of dedicated substation power, greenfield engineering and Tseung Kwan O's cable-landing-station cluster suits cloud platforms, carriers and enterprises seeking high-tier capacity outside the industrial estate.

  • First HKSAR land reserved for high-tier data centers
  • About 474,000 sq ft of gross data center space
  • On-premise 132 kV power substation
  • LEED Gold certified greenfield build
  • Around 1.2 million sq ft adjacent expansion potential

Sampaikan kebutuhan Anda — kami mencocokkan dengan pusat data di katalog kami dan mengembalikan penawaran nyata. Gratis untuk pembeli.

Minta Penawaran

Sumber: SUNeVision — MEGA Plus · data pending on-site verification