▮▮Colocation Index
← Netherlands

Iron Mountain AMS-1

Operational

J.W. Lucasweg 35, 2031 BE Haarlem

23-acre campus near Amsterdam with 13.1 MW of current capacity and a 10 MW expansion underway, the Netherlands' first 100% renewable-powered data center.

Operator

Iron Mountain

City

Haarlem, Netherlands

Power, MW

13.1 MW

Cooling

Air

Floor space

17,000 m²

Renewable energy

100%

Tier III designISO 27001ISO 50001ISO 14001ISO 22301ISO 9001SOC 2 Type IISOC 3PCI-DSSBREEAM

Iron Mountain's AMS-1 sits on a 23-acre secure campus at J.W. Lucasweg 35 in Haarlem, about 20 km west of Amsterdam and 17 km from Schiphol — far enough from the constrained city grid to keep expanding, close enough to stay on the metro's fiber routes. The single-story facility currently offers 17,000 sqm across seven data halls with 13.1 MW of capacity; full build-out targets 30,000 sqm and 43.1 MW, with the next 10 MW phase expected by 2027. It was the first data center in the Netherlands powered entirely by renewables, matched 100% through dedicated solar and tidal contracts with 24/7 carbon-free energy tracking. Design follows Tier III principles with 2N/N+1 power and N+1 cooling, hot/cold aisle containment and cabinets up to 52U for higher-density configurations. More than 60 carriers are available on site, alongside access to AMS-IX, NL-ix and NDIX. Certifications include ISO 27001, 50001, 14001, 22301 and 9001, SOC 2 Type II, SOC 3, PCI-DSS and BREEAM. The profile suits hyperscale cloud and enterprises needing room to grow.

  • 13.1 MW live today; 43.1 MW and 30,000 sqm at full build-out
  • First 100% renewable-powered data center in the Netherlands (solar and tidal PPAs)
  • 23-acre campus in Haarlem, 17 km from Schiphol airport
  • 60+ on-site carriers plus AMS-IX, NL-ix and NDIX access
  • Tier III design; ISO 27001/50001/14001/22301/9001, SOC 2/3, PCI-DSS, BREEAM

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

Get Quotes

Source: Iron Mountain AMS-1 page, Iron Mountain expansion news · data pending on-site verification