Rated-4 hyperscale campus with 8,000 racks, 1.25 million sq ft and 95 MW of power, offering liquid-cooled racks for AI workloads and sourcing 50% of energy from renewables.

Betreiber

CtrlS Datacenters

Stadt

Mumbai, Indien

Leistung, MW

95 MW

Cooling

Liquid

Floor space

116,129 m²

Racks

8,000

Renewable energy

50%

AI-ready

Yes

TIA-942 Rated 4

Scale defines CtrlS's Mumbai campus: the operator quotes 8,000 racks, 1.25 million sq ft (about 116,000 sqm) of space and 95 MW of power across a multi-building hyperscale site, with five data center buildings operational in the city and additional buildings under development. CtrlS builds to Rated-4 standards — the highest fault-tolerance classification — and wraps its facilities in the company's 'Nine Zone' security model. For AI tenants the campus offers liquid-cooled rack options engineered for high-density GPU clusters, a differentiator among Indian colocation providers. Half of the campus's energy is drawn from renewable sources, which CtrlS says makes it the largest renewable-powered campus in Mumbai. The location keeps customers inside India's financial capital, close to the country's densest enterprise demand and the subsea cable systems landing on the Mumbai coast. The campus is pitched at banks, exchanges and payment companies that require fault-tolerant infrastructure, hyperscalers scaling cloud regions, and enterprises consolidating into a single high-security metro footprint with room to grow.

  • 95 MW, 8,000 racks across 1.25 million sq ft
  • Rated-4 design with Nine Zone security model
  • Liquid-cooled racks offered for AI workloads
  • 50% of campus energy from renewables
  • Five operational buildings, further expansion underway

Beschreiben Sie Ihren Bedarf — wir matchen Sie mit Rechenzentren aus unserem Katalog und liefern echte Angebote. Kostenlos für Käufer.

Angebote erhalten

Quelle: CtrlS — Data Centers · data pending on-site verification