CyrusOne FRA5
En serviceIndustrieweg 45, Hanau
CyrusOne campus in Hanau near Frankfurt delivering 54 MW of IT capacity across 18,000 sqm in two three-story buildings.
Opérateur
CyrusOne
Ville
Hanau, Allemagne
Puissance, MW
54 MW
Cooling
Air
Floor space
18,000 m²
Renewable energy
100%
CyrusOne's FRA5 campus at Industrieweg 45 in Hanau extends the Frankfurt market eastward, offering 54 MW of IT capacity across 18,000 sqm of technical space in two separate three-story buildings. Each data hall is served by a dedicated 9 MW electrical plant, with active/active dual redundant power supplies totalling 90 MVA behind the site. The build quality targets heavy enterprise deployments: 900 mm heavy-duty raised floors under 3,600 mm clear ceiling heights, air-cooled UPS modules that engage mechanical cooling only in high ambient conditions, and closed-loop water systems that keep both PUE and WUE low. The campus is 100% powered by renewable energy and runs a Zero Waste to Landfill program, with BREEAM "Very Good", ISO 14001 and ISO 50001 as target certifications. Security is staffed 24/7/365 with layered access control and video surveillance. FRA5 works for hyperscale and wholesale tenants that want Frankfurt-market capacity at lower site density than the Sossenheim cluster.
- ▮54 MW across 18,000 sqm in two three-story buildings in Hanau
- ▮Dedicated 9 MW electrical plant per data hall; 90 MVA active/active supply
- ▮900 mm raised floors with 3,600 mm clear height
- ▮100% renewable power and Zero Waste to Landfill program
- ▮BREEAM Very Good, ISO 14001 and ISO 50001 targeted
Décrivez votre besoin — nous vous mettons en relation avec les data centers de notre catalogue et vous transmettons de vrais devis. Gratuit pour les acheteurs.
Obtenir des devisSource: CyrusOne FRA5 facility page · data pending on-site verification