CyrusOne campus in Hanau near Frankfurt delivering 54 MW of IT capacity across 18,000 sqm in two three-story buildings.

事業者

CyrusOne

都市

Hanau, ドイツ

電力, MW

54 MW

Cooling

Air

Floor space

18,000 m²

Renewable energy

100%

CyrusOne's FRA5 campus at Industrieweg 45 in Hanau extends the Frankfurt market eastward, offering 54 MW of IT capacity across 18,000 sqm of technical space in two separate three-story buildings. Each data hall is served by a dedicated 9 MW electrical plant, with active/active dual redundant power supplies totalling 90 MVA behind the site. The build quality targets heavy enterprise deployments: 900 mm heavy-duty raised floors under 3,600 mm clear ceiling heights, air-cooled UPS modules that engage mechanical cooling only in high ambient conditions, and closed-loop water systems that keep both PUE and WUE low. The campus is 100% powered by renewable energy and runs a Zero Waste to Landfill program, with BREEAM "Very Good", ISO 14001 and ISO 50001 as target certifications. Security is staffed 24/7/365 with layered access control and video surveillance. FRA5 works for hyperscale and wholesale tenants that want Frankfurt-market capacity at lower site density than the Sossenheim cluster.

  • 54 MW across 18,000 sqm in two three-story buildings in Hanau
  • Dedicated 9 MW electrical plant per data hall; 90 MVA active/active supply
  • 900 mm raised floors with 3,600 mm clear height
  • 100% renewable power and Zero Waste to Landfill program
  • BREEAM Very Good, ISO 14001 and ISO 50001 targeted

要件をお知らせください。カタログ内のデータセンターとマッチングし、実際の見積もりをお返しします。購入者は無料です。

見積もり依頼

出典: CyrusOne FRA5 facility page · data pending on-site verification