Purpose-built second block of the AIMS Cyberjaya campus with a total IT load of 8 MW.

Operator

AIMS Data Centre

Kota

Cyberjaya, Malaysia

Daya, MW

8 MW

Cooling

Air

Opened

2024

Max density

20 kW/rack

TIA-942 Rated 3

Delivered in just nine months in partnership with Gamuda Engineering, the second building on the AIMS Cyberjaya campus went ready-for-service in 2024 with 8 MW of IT load. It was conceived as the campus's high-density option: rack power reaches up to 20 kW at the top of the range, supported by an air-cooled design that AIMS says holds PUE at 1.5 or below at full load. In December 2024 the building earned ANSI/TIA-942-C Rated 3 Constructed Facility certification from EPI covering levels 1, 4 and 5, valid through 2027. Sitting alongside Block 1 on Jalan Teknokrat 1/2, it inherits the campus's cloud on-ramps, MyIX interconnection and TVRA-grade physical security, while offering newer electrical and mechanical plant. The density ceiling makes it a fit for enterprises consolidating heavier compute footprints — virtualization clusters, private cloud and inference-class GPU nodes — without stepping up to a dedicated liquid-cooled hall.

  • 8 MW IT load, ready for service in 2024
  • Up to 20 kW per rack at the highest range
  • PUE of 1.5 or below at full load
  • TIA-942 Rated 3 Constructed Facility certified (EPI, Dec 2024)
  • Built in nine months with Gamuda Engineering

Sampaikan kebutuhan Anda — kami mencocokkan dengan pusat data di katalog kami dan mengembalikan penawaran nyata. Gratis untuk pembeli.

Minta Penawaran

Sumber: AIMS Cyberjaya Block 2 announcement · data pending on-site verification