AIMS Cyberjaya Block 2
稼働中Jalan Teknokrat 1/2, Cyber 3, Cyberjaya, Selangor, Malaysia
Purpose-built second block of the AIMS Cyberjaya campus with a total IT load of 8 MW.
事業者
AIMS Data Centre
都市
Cyberjaya, マレーシア
電力, MW
8 MW
Cooling
Air
Opened
2024
Max density
20 kW/rack
Delivered in just nine months in partnership with Gamuda Engineering, the second building on the AIMS Cyberjaya campus went ready-for-service in 2024 with 8 MW of IT load. It was conceived as the campus's high-density option: rack power reaches up to 20 kW at the top of the range, supported by an air-cooled design that AIMS says holds PUE at 1.5 or below at full load. In December 2024 the building earned ANSI/TIA-942-C Rated 3 Constructed Facility certification from EPI covering levels 1, 4 and 5, valid through 2027. Sitting alongside Block 1 on Jalan Teknokrat 1/2, it inherits the campus's cloud on-ramps, MyIX interconnection and TVRA-grade physical security, while offering newer electrical and mechanical plant. The density ceiling makes it a fit for enterprises consolidating heavier compute footprints — virtualization clusters, private cloud and inference-class GPU nodes — without stepping up to a dedicated liquid-cooled hall.
- ▮8 MW IT load, ready for service in 2024
- ▮Up to 20 kW per rack at the highest range
- ▮PUE of 1.5 or below at full load
- ▮TIA-942 Rated 3 Constructed Facility certified (EPI, Dec 2024)
- ▮Built in nine months with Gamuda Engineering
要件をお知らせください。カタログ内のデータセンターとマッチングし、実際の見積もりをお返しします。購入者は無料です。
見積もり依頼出典: AIMS Cyberjaya Block 2 announcement · data pending on-site verification