YTL Green Data Center Park

建設中

Kulai, Johor

500 MW solar-powered data centre campus on 275 acres in Kulai, Johor, with the first 72 MW under development, Shopee as an anchor co-locator and an AI data centre planned in collaboration with NVIDIA.

事業者

YTL Data Center Holdings

都市

Kulai, マレーシア

電力, MW

500 MW

Cooling

Air

AI-ready

Yes

YTL's Kulai development takes a different route from Johor's other hyperscale parks: it pairs a planned 500 MW of data centre capacity with its own 500 MW solar plant, marketed as Malaysia's first integrated data centre park powered by renewable solar energy, with grid backup from the national utility. Located in the Iskandar region roughly 30 km from Singapore, the park launched with an RM 1.5 billion first phase after Sea Limited (Shopee's parent) signed as anchor tenant, taking 32 MW of the initial capacity; the first 72 MW facility was targeted for operation in early 2024. The site has since become the home of YTL AI Cloud, with a first 20 MW facility built around liquid-cooled NVIDIA GB200 GPU supercomputers completed as part of a multi-billion-dollar collaboration with NVIDIA, and GDS is also developing on the campus. Dark fibre into Singapore provides low-latency reach for tenants. The park courts hyperscalers, AI platforms and companies with renewable-energy mandates seeking green capacity at Johor scale.

  • 500 MW campus paired with dedicated 500 MW solar generation
  • Sea Limited (Shopee) anchor tenant with 32 MW of first-phase capacity
  • First phase RM 1.5 billion; initial 72 MW facility targeted for early 2024
  • 20 MW NVIDIA GB200 liquid-cooled AI facility completed for YTL AI Cloud
  • Dark fibre to Singapore, ~30 km away in Johor's Iskandar region