▮▮Colocation Index
← เนเธอร์แลนด์

NTT Amsterdam 1 Data Center

เปิดให้บริการ

Aviolanda 1, Schiphol-Rijk

Data center campus in Schiphol-Rijk with 7,500+ sqm of IT space and 20.7 MW IT load, expandable to 40 MW at full build-out.

ผู้ให้บริการ

NTT Global Data Centers

เมือง

Amsterdam, เนเธอร์แลนด์

กำลังไฟ, MW

20.7 MW

Cooling

Air

Opened

2020

Floor space

7,500 m²

ISO 9001ISO 22301ISO 45001ISO 50001PCI DSS

Formerly e-shelter Amsterdam 1, NTT Global Data Centers' Amsterdam 1 campus came online in 2020 on a 40,000 sqm plot at Aviolanda 1 in the Schiphol-Rijk industrial estate, close to Amsterdam Airport. The campus currently delivers 20.7 MW of IT load across more than 7,500 sqm of IT space, with a build-out path to roughly 40 MW and 17,200 sqm as additional buildings complete. As a carrier-neutral operator, NTT provides access to multiple cloud on-ramps, internet exchanges and telecom networks, including its own Tier 1 Global IP Network. Published certifications for the location include ISO 9001, ISO 22301, ISO 45001, ISO 50001 and PCI DSS. The phased campus model — discrete buildings added as demand materialises — is aimed squarely at wholesale and hyperscale-adjacent customers that need contiguous capacity reserved in the Amsterdam market, while the Schiphol-Rijk location keeps it within the metro's established fiber corridors. Rack counts and per-rack density figures are not publicly disclosed.

  • 20.7 MW IT load today, expandable to about 40 MW at full build-out
  • 7,500+ sqm IT space now, 17,200 sqm planned across the campus
  • Opened 2020 in Schiphol-Rijk; formerly e-shelter Amsterdam 1
  • Carrier-neutral with access to NTT's Tier 1 Global IP Network
  • ISO 9001/22301/45001/50001 and PCI DSS certified

บอกความต้องการของคุณ — เราจะจับคู่กับดาต้าเซ็นเตอร์ในแคตตาล็อกและส่งใบเสนอราคาจริงกลับมา ฟรีสำหรับผู้ซื้อ

ขอใบเสนอราคา

แหล่งที่มา: NTT Amsterdam 1 facility page · data pending on-site verification