NTT Frankfurt 4 Data Center
运营中Voltastrasse 15, 65795 Hattersheim am Main
NTT Global Data Centers' Frankfurt 4 facility, part of its EMEA data center platform in the Frankfurt metro.
运营商
NTT Global Data Centers
城市
Frankfurt, 德国
电力, MW
—
Cooling
Air
Opened
2019
NTT Global Data Centers launched the first phase of Frankfurt 4 in 2019 at Voltastrasse 15 in Hattersheim am Main, about 15 km west of central Frankfurt, where land and power are easier to secure than inside the city. The campus opened with building A providing 4,800 sqm of IT space and up to 12 MW of critical load, and has since expanded to more than 14,200 sqm and 34.4 MW in operation; at full build-out the site is planned to reach 32,900+ sqm and 82.3 MW across seven buildings. As a greenfield design it follows NTT's standard for wholesale and enterprise colocation, with carrier-neutral connectivity back into the Frankfurt interconnection ecosystem. The certification set covers ISO 9001, ISO 22301, ISO 27001, ISO 50001, PCI DSS and ISAE 3402. Frankfurt 4 targets enterprises and cloud providers that want scalable multi-megawatt capacity in the Frankfurt market without competing for scarce inner-city space.
- ▮Greenfield campus in Hattersheim, first phase opened 2019
- ▮34.4 MW and 14,200+ sqm operational; planned 82.3 MW across seven buildings
- ▮Building A delivers 4,800 sqm and up to 12 MW
- ▮ISO 9001/22301/27001/50001, PCI DSS and ISAE 3402
- ▮Carrier-neutral link into the Frankfurt interconnection ecosystem