GDS Batam Nongsa Digital Park Campus (NDP1)
建设中Nongsa Digital Park, Batam, Riau Islands, Indonesia
Two-building hyperscale campus in Nongsa Digital Park, Batam — about 25 km from Singapore — with roughly 10,000 sqm net floor area and 28 MW of planned IT power, broken ground in July 2023.
运营商
GDS Holdings
城市
Batam, 印度尼西亚
电力, MW
28 MW
Cooling
Air
Floor space
10,000 m²
GDS Holdings chose Batam's Nongsa Digital Park for its first Indonesian campus, placing new capacity roughly 25 kilometers across the strait from Singapore at a time when the city-state's own supply remains constrained. NDP1 comprises two data center buildings with a planned net floor area of about 10,000 square meters and an estimated 28 MW of total IT power. GDS broke ground in mid-July 2022 within the Nongsa Special Economic Zone, and Indonesia's sovereign wealth fund INA later announced a collaboration with GDS to develop data centers in the zone. The company has said the campus will apply its next-generation Smart DC platform and make active use of local renewable energy, though no renewable percentage has been published. Sitting on the digital corridor between Singapore and Indonesia, the site targets hyperscalers and international platforms that want Singapore-adjacent capacity without Singapore's power and land limits. Certifications have not yet been published for the campus, which remains under construction.
- ▮Two-building hyperscale campus about 25 km from Singapore
- ▮Planned 28 MW IT power across roughly 10,000 sqm
- ▮Broke ground July 2022 in Nongsa Special Economic Zone
- ▮GDS Smart DC platform with local renewable energy planned
- ▮Backed by collaboration with Indonesia's sovereign wealth fund INA