▮▮Colocation Index
← 爱尔兰

Vantage Dublin Campus (DUB1)

建设中

Profile Park, Grange Castle, Dublin 22

Vantage's first Dublin campus of 405,000 sq ft comprising a 32 MW and a 20 MW facility, featuring a next-generation on-site energy solution.

运营商

Vantage Data Centers

城市

Dublin, 爱尔兰

电力, MW

52 MW

Cooling

Air

Floor space

38,000 m²

Vantage Data Centers entered the Irish market in April 2024 with DUB1, a 52MW campus at Profile Park in Grange Castle, about 15km from Dublin city centre in the metro's main hyperscale corridor. The 22-acre site carries two two-storey facilities of 32MW and 20MW totalling 405,000 sq ft (38,000 sq m), with land and power reserved for a third building. Its answer to Dublin's grid moratorium is an on-site 100 MVA multi-fuel generation plant running primarily hydrotreated vegetable oil with gas from Gas Networks Ireland, delivering N+1 redundancy and the ability to export power back to the grid. Cooling uses a closed-loop chilled-water system with air-cooled chillers and economisers, achieving near-zero water usage and N+2 mechanical redundancy, at an average design density of 300W per sq ft. Four points of entry, diverse fibre paths and multiple meet-me rooms keep the campus carrier-neutral. Representing over 1 billion euro of investment targeting a 1.2 annual PUE, DUB1 is built for hyperscale and large cloud deployments.

  • 52MW campus at Profile Park, Grange Castle: 32MW and 20MW facilities across 405,000 sq ft
  • On-site 100 MVA multi-fuel plant (HVO plus gas) bypasses Dublin grid constraints, N+1 redundant
  • Closed-loop chilled-water cooling with near-zero water usage; N+2 mechanical redundancy
  • Average design density of 300W/sq ft; annual PUE target of 1.2
  • Carrier-neutral with four points of entry and multiple meet-me rooms; first phase targeted late 2024

告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。

获取报价

来源: Vantage Dublin campus page, Vantage press release · data pending on-site verification