CyrusOne FRA7
Đang xây dựngStroofstrasse 49, 65933 Frankfurt am Main (Griesheim)
81 MW data center under construction at the FRANKFURT WESTSIDE regeneration site, with first 9 MW phase due in Q2 2026 and one of Europe's largest waste-heat reuse projects.
Nhà vận hành
CyrusOne
Thành phố
Frankfurt, Đức
Công suất, MW
81 MW
Cooling
Air
Floor space
25,266 m²
Renewable energy
100%
FRA7 anchors the FRANKFURT WESTSIDE mixed-use regeneration project in Griesheim, where CyrusOne is turning a former industrial site at Stroofstrasse 49 into an 81 MW campus — with the first 9 MW phase due in Q2 2026. Two separate three-story buildings will offer 25,266 sqm of technical space, powered by a 150 MVA utility supply at 110 kV through a dedicated substation with a redundant grid connection. The headline feature is heat: up to 40 MW of waste heat can be exported to warm the surrounding campus, making this one of Europe's largest data center heat-reuse projects. Cooling uses free-cooling technology with closed-loop water systems to hold down both PUE and WUE. Sustainability commitments include 100% renewable power, a BREEAM "Very Good" target, DGNB Platinum pre-assessment and a Zero Waste to Landfill program, with 5,500 sqm of green space planned. Four diverse fibre routes make it a fit for hyperscale and large enterprise deployments.
- ▮81 MW campus under construction; first 9 MW phase due Q2 2026
- ▮Up to 40 MW waste-heat export — among Europe's largest heat-reuse projects
- ▮25,266 sqm of technical space in two three-story buildings
- ▮150 MVA utility supply at 110 kV via dedicated substation
- ▮BREEAM Very Good target and DGNB Platinum pre-assessment