▮▮Colocation Index
← Malaysia

Bridge Data Centres MY06

Đang hoạt động

Sedenak Tech Park, Kulai, Johor, Malaysia

Hyperscale campus in Johor listed on Bridge Data Centres' Malaysia portfolio; Bridge and ByteDance celebrated the grand opening of the first-phase hyperscale data centre in Johor in 2022.

Nhà vận hành

Bridge Data Centres

Thành phố

Kulai, Malaysia

Công suất, MW

Cooling

Air

Opened

2022

Built at remarkable speed — roughly 314 days and 2.2 million working hours from the November 2021 groundbreaking — the first building of Bridge Data Centres' MY06 campus in Sedenak Tech Park, Kulai, held its grand opening on 20 October 2022, becoming one of Malaysia's first true hyperscale data centres. The campus spans about 38–40 acres and comprises three buildings with a combined IT load of around 100 MW (the overall project has been described as 110 MW). ByteDance, through ByteDance System Sdn Bhd, is the anchor tenant with a long-term commitment, making MY06 emblematic of the Chinese-platform demand that kicked off Johor's data centre boom. Bridge, a subsidiary of Bain Capital-backed Chindata Group, operates it as a build-to-suit wholesale campus rather than retail colocation. Its Sedenak location sits in the corridor between Kulai and Iskandar Puteri that has since become Southeast Asia's densest cluster of hyperscale construction.

  • First-phase hyperscale building opened October 2022
  • Three-building campus of ~100 MW IT load on ~40 acres
  • ByteDance is the anchor tenant
  • Constructed in roughly 314 days from groundbreaking
  • Located in Sedenak Tech Park, Kulai, Johor

Cho chúng tôi biết nhu cầu của bạn — chúng tôi ghép nối với các trung tâm dữ liệu trong danh mục và gửi lại báo giá thực. Miễn phí cho người mua.

Nhận báo giá

Nguồn: Bridge Data Centres Malaysia, Bridge–ByteDance grand opening release · data pending on-site verification