Colt DCS Tokyo Inzai 4
运营中Hyperscale facility launched in February 2025 on Colt DCS's Inzai campus in Chiba, delivering 20 MW of IT power across 8,747 sqm of white space and fully sold ahead of launch.
运营商
Colt Data Centre Services
城市
Tokyo (Inzai), 日本
电力, MW
20 MW
Cooling
Air
Opened
2025
Floor space
8,747 m²
Colt DCS's fourth building on its Inzai campus in Chiba New Town was fully pre-let to a single global cloud provider before it opened in February 2025, a measure of how tight Greater Tokyo's hyperscale market has become. Inzai 4 delivers 20 MW of IT power at full build across 8,747 square meters of white space, with a first phase of 4.8 MW operational at launch. The base-isolated building sits about 20 km inland in a district with low earthquake and tsunami exposure, roughly 40 minutes from central Tokyo, on a campus Colt DCS has operated since 2011 and which will reach around 70 MW once Inzai 4 is complete. Built to the operator's Global Reference Design under a joint venture backed by Fidelity Investments and Mitsui & Co., the facility incorporates low-embodied-carbon construction, reduced water consumption in cooling, and chillers using low-GWP refrigerants. Engineering targets Colt's Tier 3-equivalent concurrent-maintainability standard, and the design brief explicitly extends beyond cloud to high performance computing and AI service providers requiring dense, contiguous capacity near Tokyo.
- ▮20 MW IT power across 8,747 sqm white space
- ▮Fully pre-let to a global cloud provider before launch
- ▮Base-isolated building in low seismic-risk Chiba New Town
- ▮Fourth building on Colt's roughly 70 MW Inzai campus
- ▮Opened February 2025 with 4.8 MW first phase
告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。
获取报价来源: Colt DCS — Inzai 4, Colt DCS press release — Inzai 4 opening · data pending on-site verification