EdgeConneX Cyberjaya Campus
已公布Cyberjaya, Selangor, Malaysia
Planned EdgeConneX campus of nine buildings over 30 acres in Cyberjaya with more than 200 MW of capacity.
运营商
EdgeConneX
城市
Cyberjaya, 马来西亚
电力, MW
200 MW
Cooling
Air
Floor space
200,000 m²
Max density
20 kW/rack
Nine buildings across a 30-acre estate make the Cyberjaya campus the volume play in EdgeConneX's Malaysian expansion, and by capacity its largest commitment in the country. The operator quotes 67 MW of current capacity scaling beyond 200 MW at full build, backed by a 275 kV substation and around 200,000 sqm of space in Malaysia's established data-center hub southwest of Kuala Lumpur. Construction began in January 2024, with EdgeConneX targeting a fully functional campus within 20 to 24 months of the start. Engineering follows the company's standard Malaysian template: concurrently maintainable power in at least an N+1 configuration, N+1 chilled-water cooling with separate fan-wall and CRAH units, support for cabinet densities up to 20 kW, and carrier-neutral connectivity through diverse fibre conduits and multiple meet-me rooms. Security layering includes mantraps, multi-stage containment, interior security zones, and on-site NOC services, with SOC 2 Type 2, PCI DSS, and ISO 27001 as the stated compliance targets. The multi-building format is pitched at customers with staged, large-scale requirements — from cloud regions to enterprise consolidations — while sustainability work with TNB covers renewable energy supply.
- ▮Nine-building campus over 30 acres in Cyberjaya
- ▮67 MW current capacity, scalable beyond 200 MW
- ▮275 kV substation; ~200,000 sqm of space
- ▮Construction started January 2024, full campus targeted in 20-24 months
- ▮Up to 20 kW per cabinet on N+1 chilled-water cooling
告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。
获取报价来源: EdgeConneX Malaysia · data pending on-site verification