Switch The Citadel Campus (TAHOE RENO 1)
运营中2,000-acre PRIME campus in the Tahoe Reno Industrial Center designed for up to 17.4 million sq ft and 850 MW at full build, powered by 100% renewable energy.
运营商
Switch
城市
Tahoe Reno, 美国
电力, MW
850 MW
Cooling
Air
Opened
2017
Floor space
120,774 m²
Max density
42 kW/rack
Renewable energy
100%
Few colocation projects match the stated ambition of Switch's Citadel Campus: 2,000 acres in the Tahoe Reno Industrial Center, master-planned for up to 17.4 million square feet of data center space and 850 MW of power. The first building, TAHOE RENO 1, opened in 2017 with up to 1.3 million square feet and 130 MW, built to the Tier IV Gold design standards Switch established in Las Vegas and supporting cabinet densities up to 42 kW. The campus sits next to the Tesla Gigafactory and runs entirely on renewable energy, with Switch holding the only 100 percent Clean Energy Index score in Greenpeace's industry ranking at the time of opening. Connectivity runs over the Switch SUPERLOOP, a roughly 500-mile fiber system that puts Silicon Valley about 4 milliseconds away, Las Vegas 7 and Los Angeles 9, combining Nevada's power economics of around 4.9 cents per kWh with near-Bay Area latency. The Citadel targets hyperscale, AI and enterprise customers deploying at campus scale.
- ▮2,000-acre campus planned for 17.4M sq ft, 850 MW
- ▮TAHOE RENO 1: 1.3M sq ft, 130 MW, opened 2017
- ▮Up to 42 kW per cabinet
- ▮100% renewable energy, ~4.9 cents/kWh power
- ▮SUPERLOOP fiber: ~4 ms to Silicon Valley
告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。
获取报价来源: Switch — The Citadel Campus, Switch press release — Tahoe Reno opening · data pending on-site verification