Vantage Cyberjaya II Campus
Đang xây dựngCyberjaya, Selangor
Vantage's second Cyberjaya campus, a 256 MW development on which the operator broke ground.
Nhà vận hành
Vantage Data Centers
Thành phố
Cyberjaya, Malaysia
Công suất, MW
256 MW
Cooling
Air
Floor space
445,000 m²
Ground broke on Cyberjaya II in August 2024 as a 256 MW project, but Vantage has since enlarged the plan: the operator's site now describes a 52-acre (21-hectare) campus delivering 436 MW of critical IT load across six data centres and about 445,000 sqm (4.8 million sq ft) at full development — a different order of magnitude from the 31 MW KUL1 campus a short drive away. Energy comes from Tenaga Nasional Berhad through an on-campus 500 MVA-rated substation on a 275 kV high-voltage connection, with N+1 redundancy across systems. Cooling uses closed-loop chilled water from air-cooled chillers at near-zero water consumption per kW, and the halls are being built liquid-cooling ready for future high-density and AI deployments. Each building gets two meet-me-rooms, with five fibre points of entry serving the carrier-neutral campus. The development forms the core of Vantage's announced USD 3 billion Malaysian investment and targets hyperscale cloud and AI tenants wanting large-block capacity in the Kuala Lumpur metro.
- ▮Broke ground August 2024; initially announced at 256 MW
- ▮Full campus plan: 436 MW, six buildings, ~445,000 sqm on 52 acres
- ▮On-site 500 MVA substation via 275 kV connection from TNB
- ▮Liquid-cooling ready halls, near-zero water use cooling design
- ▮Two meet-me-rooms per building, five campus fibre points of entry