Vantage Cyberjaya II Campus

建设中

Cyberjaya, Selangor

Vantage's second Cyberjaya campus, a 256 MW development on which the operator broke ground.

运营商

Vantage Data Centers

城市

Cyberjaya, 马来西亚

电力, MW

256 MW

Cooling

Air

Floor space

445,000 m²

Ground broke on Cyberjaya II in August 2024 as a 256 MW project, but Vantage has since enlarged the plan: the operator's site now describes a 52-acre (21-hectare) campus delivering 436 MW of critical IT load across six data centres and about 445,000 sqm (4.8 million sq ft) at full development — a different order of magnitude from the 31 MW KUL1 campus a short drive away. Energy comes from Tenaga Nasional Berhad through an on-campus 500 MVA-rated substation on a 275 kV high-voltage connection, with N+1 redundancy across systems. Cooling uses closed-loop chilled water from air-cooled chillers at near-zero water consumption per kW, and the halls are being built liquid-cooling ready for future high-density and AI deployments. Each building gets two meet-me-rooms, with five fibre points of entry serving the carrier-neutral campus. The development forms the core of Vantage's announced USD 3 billion Malaysian investment and targets hyperscale cloud and AI tenants wanting large-block capacity in the Kuala Lumpur metro.

  • Broke ground August 2024; initially announced at 256 MW
  • Full campus plan: 436 MW, six buildings, ~445,000 sqm on 52 acres
  • On-site 500 MVA substation via 275 kV connection from TNB
  • Liquid-cooling ready halls, near-zero water use cooling design
  • Two meet-me-rooms per building, five campus fibre points of entry

告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。

获取报价

来源: Vantage Cyberjaya II, Vantage groundbreaking press release · data pending on-site verification