e& SmartHub Fujairah Campus
Đang hoạt độngFujairah, UAE (adjacent to the cable landing station)
Carrier-neutral SmartHub campus established in 2011 at the Fujairah subsea cable landing hub, expanded in 2024 with a fourth Tier III facility adding 1.5 MW.
Nhà vận hành
e& (Etisalat)
Thành phố
Fujairah, UAE
Công suất, MW
—
Cooling
Air
Opened
2011
Fujairah's position on the Gulf of Oman, outside the Strait of Hormuz, has made it one of the world's densest subsea cable landing points — and e&'s SmartHub campus there, established in 2011, is built directly on that advantage. The carrier-neutral campus sits at the cable landing station serving systems that link the Middle East with Europe, the United States, Asia and Africa, so tenants exchange traffic with minimal or zero backhaul cost and correspondingly low latency. In early 2024 e& added a fourth Tier III facility contributing 1.5 MW of new capacity and lifting the campus total to about 4 MW, sized ahead of two further cable systems expected in 2025. Services cover colocation, hosting, international connectivity, cross-connects and IP transit. The customer base is network-centric — Tier 1 carriers, hyperscalers, CDNs, OTT platforms and ISPs — for whom Fujairah works as a regional traffic gateway and subsea interconnect point rather than a general enterprise colocation market.
- ▮Carrier-neutral SmartHub campus established in 2011 at Fujairah's subsea cable landing hub
- ▮Fourth Tier III facility added in 2024 with 1.5 MW, bringing campus capacity to ~4 MW
- ▮Direct access to subsea systems linking the Middle East, Europe, the US, Asia and Africa
- ▮Minimal or zero backhaul fees and ultra-low latency from the coastal cable landing location
- ▮Serves Tier 1 carriers, hyperscalers, CDNs, OTT platforms and ISPs
Cho chúng tôi biết nhu cầu của bạn — chúng tôi ghép nối với các trung tâm dữ liệu trong danh mục và gửi lại báo giá thực. Miễn phí cho người mua.
Nhận báo giáNguồn: e& press release · data pending on-site verification