▮▮Colocation Index
← 阿联酋

e& SmartHub Fujairah Campus

运营中

Fujairah, UAE (adjacent to the cable landing station)

Carrier-neutral SmartHub campus established in 2011 at the Fujairah subsea cable landing hub, expanded in 2024 with a fourth Tier III facility adding 1.5 MW.

运营商

e& (Etisalat)

城市

Fujairah, 阿联酋

电力, MW

Cooling

Air

Opened

2011

Tier III

Fujairah's position on the Gulf of Oman, outside the Strait of Hormuz, has made it one of the world's densest subsea cable landing points — and e&'s SmartHub campus there, established in 2011, is built directly on that advantage. The carrier-neutral campus sits at the cable landing station serving systems that link the Middle East with Europe, the United States, Asia and Africa, so tenants exchange traffic with minimal or zero backhaul cost and correspondingly low latency. In early 2024 e& added a fourth Tier III facility contributing 1.5 MW of new capacity and lifting the campus total to about 4 MW, sized ahead of two further cable systems expected in 2025. Services cover colocation, hosting, international connectivity, cross-connects and IP transit. The customer base is network-centric — Tier 1 carriers, hyperscalers, CDNs, OTT platforms and ISPs — for whom Fujairah works as a regional traffic gateway and subsea interconnect point rather than a general enterprise colocation market.

  • Carrier-neutral SmartHub campus established in 2011 at Fujairah's subsea cable landing hub
  • Fourth Tier III facility added in 2024 with 1.5 MW, bringing campus capacity to ~4 MW
  • Direct access to subsea systems linking the Middle East, Europe, the US, Asia and Africa
  • Minimal or zero backhaul fees and ultra-low latency from the coastal cable landing location
  • Serves Tier 1 carriers, hyperscalers, CDNs, OTT platforms and ISPs

告诉我们您的需求——我们从目录中为您匹配数据中心并返回真实报价。买方免费。

获取报价

来源: e& press release · data pending on-site verification